Campuses
Read More493 / 1055
A 260-foot crane is being used to load steel beams at the construction site of the new engineering facility.
Filename: CAM-14-4128-9.jpg
DuckeringcampusconstructionverticaloutsidespringcraneEngineering Facility
- No Comments
All media are protected by copyright and may not be downloaded or used without permission. If you are interested in obtaining permission to use an image from our gallery, please fill out the online image request form.
The University of Alaska Fairbanks is an AA/EO employer and educational institution and prohibits illegal discrimination against any individual. Learn more about UA's notice of nondiscrimination.
The site is maintained by UAF University Relations • 907-474-6281 • Fax: 907-474-6283 • uaf.web@alaska.edu
The University of Alaska Fairbanks is an AA/EO employer and educational institution and prohibits illegal discrimination against any individual. Learn more about UA's notice of nondiscrimination.
The site is maintained by UAF University Relations • 907-474-6281 • Fax: 907-474-6283 • uaf.web@alaska.edu